News

Culvert installation wraps up

18 December 2025

Installation of culverts across Lake Albert Road and the Lake Albert shared path (200m north of Eastlake Drive) has been completed.

Minor works on the road and path are ongoing.

The culverts are part of the early works for the transfer of water from the Murrumbidgee River to the Lake via a pipeline, to be constructed in 2026.